He Asked Us to Price a Filter for His Cooling Tower. The Filter Only Ever Sees a Tenth of the Water.

The enquiry came in as a price request, and it was a reasonable one. A commercial building here in Cebu, a chilled-water plant, a cooling tower on the roof deck. The chemical bill had been climbing for two years, the tower basin was dirty enough that somebody had started hosing it out on Sundays, and a contractor had told the owner that what he needed was a filter. So he asked us what a filter would cost.

I want to be straight about what this note is before the numbers start, because it is not the usual kind of post on this blog. We have not built a cooling tower side-stream filtration plant. Our work is overwhelmingly sewage and the plants around it, and an enquiry like this one arrives a few times a year; we have worked them on paper, and we have been brought in at the filtration end. There is a note on our own website about side-stream filtration on cooling towers, and that note is our media supplier's process description and not ours — it is still on the site, under cooling tower filtration — carrying their figures for a generic duty. Two of our own posts have pointed readers at it and promised a separate note of our own, in the post about a sand bed that had quietly stopped behaving as a bed and in the one about the gap between secondary treatment and reuse, and both of those notes are linked where they belong further down. This is that note, and every process figure in it is labelled as whose it is.

It is also a different subject from the posts where a cooling tower has appeared before. In the post on which rung of reuse a design actually buys and in the arithmetic of whether reuse pays at all, the tower is the destination — the place treated effluent goes, and what matters is what concentrates once it gets there. Here the tower is the system, and its own circulating water is the thing being treated. The other near neighbour is the note on reducing hexavalent chromium, which set out a filter bed's operating window at metals-removal velocity. The same kind of vessel turns up here running at two to four times that velocity, doing a different job, and that difference is most of what this post is about.

A cooling tower is a concentrator. That is the whole of it.

A tower rejects heat by evaporating water. The water leaves as vapour and the dissolved load it was carrying stays behind in the basin. Make-up water comes in to replace the volume, carrying its own dissolved load with it, and the only route by which salt leaves the circuit is blowdown — water deliberately dumped because the basin has got too concentrated. The ratio of what is in the circulating water to what is in the make-up is the cycles of concentration, and it is the single most important number on the system. Nobody we have met in a building like this one could tell us theirs.

We can at least put a local number against the make-up side, because we have measured it for other reasons. In the Cebu buildings where we have put in softeners, incoming hardness has sat in the region of 280 milligrams per litre as calcium carbonate — this is limestone country — and we keep that figure on our page on softening a commercial kitchen feed. It is also why soft water and metal pipework come up together so often here, which we worked through in the post on whether soft water would eat a building's pipes. Run that water at three cycles and the circulating hardness is of the order of 840; at four cycles, something over a thousand. That is arithmetic on a published figure and not a measurement on anybody's tower, but it is enough to show where the ceiling comes from. The number of cycles a tower here can run is set largely by the geology of the make-up water, not by the tower and not by the filter.

Ten per cent, and what that means for what you can ask of it

The arrangement the supplier's note describes, and the standard arrangement industry-wide, is a side stream of around ten per cent of the circulating flow taken off, filtered, and returned. That is the right arrangement. But it means the filter does not see ninety per cent of the water on any given pass. It is not a barrier and it cannot be one. It works by repetition — the same water comes round again, and the solids inventory in the basin falls over hours and days rather than being intercepted on the way past.

That matters because of what the owner expects. A filter that is bought as a barrier gets judged as a barrier, and three weeks later somebody looks in the basin, sees silt, and concludes the filter does not work. The same confusion turns up constantly in our own trade: a number that is real and authoritative and measuring something other than the thing the buyer cares about. We have written the same shape of problem up in the post on what a carbon's iodine number does and does not tell you, in the one on an ultraviolet unit's flow rating standing in for a dose, and in the specification that quoted a regulation ten years dead. A ten per cent side stream belongs in that family, and so does a grease trap's rated flow, which we took apart in the note on eighty litres being ninety seconds at the rated figure.

The supplier's own note says this usually does not work, and gives two reasons

This is the part of their page I find most useful, and it is worth repeating because it argues against the obvious sale. Their note says side-stream filtration is normally ineffective for two reasons: the degree of filtration is too low to be of any use, and a combination of mineral deposition and biofouling degrades the performance of quartz-based media beds. Those are their words about a generic installation, not our observation.

The second reason is the one place where our own field experience actually bears on their note, because it is a mechanism we have published from our own work. A sand bed does not fail by blocking. It fails by letting water find a path — grains cement together, the bed stops behaving as a bed, and flow runs through channels while most of the media sits idle. We wrote that up at length after a cartridge downstream blocked in four days and the bed in front of it turned out to have been channelling since about month six. On a cooling tower the fouling is mineral as well as biological, so whatever that clock is on a clean duty, it is faster here. Nothing in the differential pressure reading tells you it is happening, which is the same complaint we made about a plant that had never kept a daily record.

Fifteen to twenty metres an hour, and why the velocity is the design

The supplier's technical summary for this duty, and I am quoting their published table for a generic cooling tower and not a design of ours: side stream around ten per cent; filtration velocity 15 to 20 cubic metres per hour per square metre of bed area; expected degree of filtration 5 to 10 microns; a graded bed laid in three layers, coarsest at the laterals; backwash velocity 45 to 50; media life quoted at ten to twenty years.

Set the velocity beside the one on the metals duty. The note on their arsenic and manganese work, and the chromium page behind the reagent-ratio note already mentioned, put service velocity below 5 to 10 metres per hour — and we keep our own page on iron and manganese removal written around the slower figure, because the bed there has to hold a precipitate rather than strain a silt. So the same media, in the same kind of vessel, is run two to four times faster on a cooling tower.

That is not a detail. Velocity is what sizes the vessel, and it sizes it inversely. A ten per cent side stream off a modest tower, taken at 15 to 20 metres an hour, needs a small bed area; the same flow at the metals velocity needs three or four times the area, which is a different vessel, a different price and a different plant room. If two offers in front of you quote different vessel sizes for the same tower, the velocity each was calculated at is the first thing to find, and it is usually not on the quotation. We argued the same thing about service flow against capacity in the post about a softener with enough capacity that could not keep up with two showers, and about reading two quotations line by line in the one where ours was not the cheapest.

The backwash is the number that catches people

Look again at the two velocities in that table. Service is 15 to 20. Backwash is 45 to 50. The wash therefore runs at roughly two and a half to three times the flow the filter handles in normal service, for as long as the wash lasts. So the backwash supply — the pump, the pipework, the valve, and the water itself — is sized on a flow the installation never otherwise sees. We have made the same point about a clarifier's return in the post where the upflow figure we first wrote was wrong: the peak duty, not the average, buys the equipment.

Then there is where that water goes, and this is the part I would want settled before anything was priced. The backwash water is tower water, which is concentrated tower water by definition, now carrying the solids the bed had collected. It cannot go back to the tower, because returning it undoes the filtration you just paid for. It is not clean. So every wash is a small, deliberate blowdown with a destination, and that destination has to be named by somebody. Our standing position on this is published and it does not change for a cooling tower: everything you take out of a treatment system has to go somewhere, and if nobody has named the somewhere, it has not been designed.

What the filter is bought to reduce is an invoice, not a lab result

Here is where a cooling tower differs from everything else we work on. There is no effluent standard for the inside of a cooling tower circuit. No inspector samples the basin. The supplier's claim for the filter is that total running costs, chiefly biocides, fall dramatically, and that the hydrophilic and bio-resistant character of their media is what does it. Theirs again, and a claim about their product.

But the shape of the argument is one we are comfortable with, because it is the shape we use ourselves. Operating cost is the ownership argument, which is why we put it in front of clients in the post about the cheaper quotation not being the cheaper plant and why every component in a quotation of ours has to be justified against a financial benefit, as we set out in the note on how we build three options and leave the price to last.

The hard part is that it leaves you no instrument. If the only evidence is an invoice, then whether the filter worked is a question about bookkeeping, and it can only be answered against a baseline. That means the biocide consumption, the chemical invoice value, the cycles of concentration and the approach temperature the chiller is seeing have to be written down before the filter arrives, by somebody whose job it is. Nobody does this. It is the same failure we ran into when a plant was asked for thirty days of logs and had never kept one, and the same reason we ask for an influent analysis and almost never get one.

Raising the cycles saves water. It does not reduce the salt.

The commercial case for a side-stream filter usually runs through the cycles: a cleaner circuit tolerates higher concentration, higher cycles mean less blowdown, less blowdown means less make-up, and make-up is metered water you pay for. That part is sound arithmetic and it is where the water saving comes from.

What it does not do is reduce the mass of dissolved solids leaving the site. That mass is set by what arrives in the make-up water, and if the tower is in steady state, what comes in has to go out. Run higher cycles and the blowdown becomes smaller and saltier, carrying the same daily mass in less water. We made exactly this argument about a water softener's regeneration discharge in the brine drain note — routing and timing change the hour and the mixing, not the mass — and it is worth repeating here because the conclusion is the same and people reach for the same wrong comfort, which is the daily average.

Whether the mass or the concentration is the thing that matters depends on where the water ends up. Into a sewer, mass is usually the question. Into a receiving water, concentration can be the question too, and which limits apply follows from the class of that water and from the industry the establishment is registered under — we keep the discharge standards and the parameter list by industry on the site rather than quoting figures from memory. And blowdown is not an invisible stream. It is one of the flows a discharge permit counts: we listed cooling blowdown among the streams to count before anything gets declared in the post on what you declared being what you are held to, and the reuse arithmetic named earlier treats it as one of the nearly-clean flows you must not let share a pipe with the kitchen. Where that water arrives on site in the first place is its own question, and the one we answer from a meter reading in the post about a water bill that had been measuring the flow for eleven years, which counts tower evaporation among the losses that never reach the drain.

What we would want before anybody priced anything

If this enquiry landed again tomorrow, this is the order we would work in. It is deliberately the order we would actually do it in, not the order of importance.

  1. The tower's own nameplate: circulating flow, design evaporation rate, basin volume. Whoever maintains the chiller has this.
  2. A make-up water analysis — hardness, chloride, conductivity, iron, silica — on the actual source, which in a lot of buildings here is district water, a deep well, or both at different times of day.
  3. The cycles of concentration as they run today, taken as the ratio of blowdown to make-up conductivity, read on three different days rather than once.
  4. Twelve months of chemical delivery notes with the invoice values, which is the only baseline the result will ever be judged against.
  5. Where the blowdown goes today, established by walking the pipe rather than by asking.
  6. Then, and only then, the filtration velocity, the bed area and the backwash supply.

Only the last of those six looks like engineering, and it is the one that takes the least time. The first five are telephone calls, a laboratory bottle and a walk, and they are what decides whether the filter is worth buying at all. That ordering is not peculiar to cooling towers — it is how we approach a drawing somebody sends us in the post about reading a finished design before pricing it, and why we hold that the design and not the build decides the cost.

What travels out of this, and what does not

The concentrator argument travels. Any system that evaporates water and tops it up is concentrating whatever is in the top-up, and that is true of a tower in Cebu, a tower in Manila and an evaporative condenser on a cold room. So does the backwash point: wherever a media bed is washed, the wash flow is larger than the service flow and it has a destination, and both of those are design decisions dressed up as operating details. So does the baseline problem, and I would press that one hardest, because it is free.

The bed-fouling clock travels less well than I would like. Channelling is a mechanism we have seen and measured, but we have seen it on sand beds in filtration and water refilling duty — the work behind the note on what the four tanks in front of the membranes were for and the one on when reverse osmosis is actually needed — not inside a cooling tower circuit, where the mineral load and the biology are both different.

And the figures travel least of all. The ten per cent, the 15 to 20 metres an hour, the 5 to 10 microns, the 45 to 50 backwash and the ten to twenty year media life are our supplier's published figures for a generic duty, and I have no way to tell you how they would land on a particular roof deck in Mandaue. The hardness arithmetic is a published Cebu figure multiplied by a cycle count I guessed at to show you the shape. None of it is a measurement we have taken on a cooling tower in Cordova. The posts on this blog where the numbers are ours — the proven rates we cost from, the cone reading we use instead of tracking suspended solids, the clarifier detail we standardised — are a different kind of post, and the difference is worth knowing when you are deciding how much weight to put on either.

If this work came to us, we would take it at the filtration end and say plainly which side of the line we were on, which is already our stated position on jobs where treated effluent feeds a tower: one supplier owns the plant and another owns the tower's own water, and we have watched that split fall down the gap between the two. We specify equipment for the decade after the handover rather than the week of it, we would not put a chemical at the centre of the design that cannot be reliably bought here, and if the honest answer were that the owner's cycles are limited by his make-up water and no filter changes that, we would say so and lose the sale. An operator can carry a plant; he cannot carry a bad design, and nobody can carry a filter that was bought to solve the wrong number.

Our own work, the plants and the pages behind it, sits on our wastewater services page and the Cebu page, with the jobs themselves on the completed projects list. If you want to put rough numbers on a sewage plant rather than a tower, there is the price estimator and the request page, and our operations and maintenance support and the maintenance page cover the running side.

If you have a tower whose chemical bill is climbing and nobody has written down the cycles, that is a short conversation and a useful one. Book a free 15-minute consultation and bring the delivery notes.